How can we help?
-
Getting Started
-
- LeagueApps Integration
- LeagueAthletics CSV Integration
- LeagueAthletics DirectLink Integration
- SportsEngine DirectLink Integration (tutorial movie)
- Tutorial: Across Division Scheduling
- Tutorial: Introduction to Diamond Scheduler
- Tutorial: League Creation Assistant
- Tutorial: Locked Game Scheduling Technique
- Tutorial: Scheduling Multiple Divisions
- Tutorial: Scheduling Practices
- Tutorial: The Division Tab
- Tutorial: The People Tab
- Tutorial: The Schedule Tab
- Tutorial: The Team Tab
- Tutorial: Travel Constraints
-
Program Sections
-
Scheduling
-
- Damaged or Corrupt File Message
- Display Time and Date Constraints in Master Calendar and Game List
- Known Issues
- Problems with AIR and Catalina OS
- Program is Slow in Calendar
- Program says I have No Timeslots Available
- Retrieving a Backup File
- Schedule Will Not Finish
- Sending Your Schedule File
- Updates Frequency
-
- Accessing Account Information
- Across Division & Across League Divisions
- Assigning Officials to Games
- Change a Team's Division
- Changing Division Associations of Timeslots
- Creating Timeslots
- Display Time and Date Constraints in Master Calendar and Game List
- Entering Scores
- How to Avoid Double-booking Coaches and Players
- Move Season's Start Date
- Moving Schedule
- Pool Play
- Reduce Time Between Games on Same Day
- Schedule Reports
- Schedule Will Not Finish
- Switching Timeslots
- Tutorial: Locked Game Scheduling Technique
- Tutorial: Scheduling Multiple Divisions
- Using a Previous Year's File
- Show all articles ( 4 ) Collapse Articles
-
Importing and Exporting
-
Integration with Others
- Deleting Existing Games on SportsEngine (uploaded using CSV)
- Deleting Existing Games on SportsEngine (uploaded using DirectLink)
- Downloading SportsEngine Mapping Codes
- LeagueApps Integration
- LeagueAthletics CSV Integration
- LeagueAthletics DirectLink Integration
- SportsEngine CSV Integration
- SportsEngine DirectLink Integration (tutorial movie)
-
Administration
Let’s say you have a coach who manages two different teams in two different divisions. You certainly don’t want those two teams to be scheduled at the same time. The approach described below relates to coaches but the same procedure can be used to avoid double-booking players.
First create a coach in the people tab.
You can customize the labels used on the people tab by clicking the configuration button.
Once you have created the coach, assign them to the two (or more teams) they manage.
When you run the first schedule that involves the coach, nothing unusual will happen. It should schedule as normal. However, when you go to schedule the second division, you will be presented with this dialog box.
As you can see, you have 3 choices.
- Ignore the conflicts (let’s say there’s an assistant coach who can cover some of the games)
- Make sure the coach is not scheduled for a second game on the same day
- Require x number of minutes from the start of the first game to the start of the second games.
This feature will avoid double-booking coaches and/or players.
Keywords: Coach,coaches,coach conflicts, two teams, manager, manager conflicts,conflicts,multiple games,multiple teams,two different teams
0 out Of 5 Stars
5 Stars | 0% | |
4 Stars | 0% | |
3 Stars | 0% | |
2 Stars | 0% | |
1 Stars | 0% |